Transformer maintenance · Electrical & mechanical

Keep the power on. Keep production moving.

Tecc Oil tests, maintains and repairs the transformers that South African mines and industrial plants depend on. Oil, electrical and mechanical work, delivered by one accountable team.

  • SANAS-accredited lab analysis
  • Mobile on-site oil purification
  • Electrical + mechanical, one team
Tecc Oil technician servicing the breather on an oil-filled distribution transformer, with a Tecc Oil service label on the tank
Every unit, on record

Each transformer we service is labelled with its sample date, oil batch, lab report number and technician.

Trusted on sites operated by

  • Harmony Gold
  • Implats (Impala Platinum)
  • Sibanye-Stillwater
  • Glencore South Africa
  • Petra Diamonds
  • Kalagadi Manganese

01 / Services

Everything a transformer needs, from one team.

Transformer failures rarely have a single cause. A weeping gasket lets moisture in, wet oil weakens the insulation, and weak insulation ends in a fault. We cover the whole chain, so nothing falls between contractors.

Leak→Moisture→Weak insulation→Fault
Tecc Oil trailer-mounted transformer oil purification plant connected on site 01 — OIL

Oil sampling, analysis & purification

The oil tells you how a transformer is really doing. We sample it properly, have it tested, and treat it on site.

  • Oil sampling and SANAS-accredited lab analysis
  • DGA, moisture, dielectric strength, acidity, PCB and furans
  • On-site purification with our mobile plant
  • Oil top-ups, replacement and PCB labelling
Technician working on a transformer core and coil assembly above a cable box with terminated cables 02 — ELECTRICAL

Electrical testing & repairs

Diagnostic testing to find problems early, and the electrical work to fix them, from terminations to switchgear.

  • Insulation resistance, turns ratio and winding resistance
  • Tap changer inspection and servicing
  • Bushings and cable terminations
  • Mini-substation, RMU and MV switchgear maintenance
Two technicians carrying out maintenance on a pair of oil-filled distribution transformers 03 — MECHANICAL

Mechanical repairs & refurbishment

Stop the leaks, keep moisture out, and keep tanks, radiators and fittings in condition for decades of service.

  • Oil leak repairs and gasket replacement
  • Silica-gel breather replacement
  • Radiator, valve and tank repairs
  • Corrosion treatment, repainting and active-part repairs

02 / Approach

Evidence first. Then action.

Every recommendation we make is backed by a test result. You'll know what needs attention now, what can wait, and why.

  1. Inspect

    We visit site, record nameplate data, check each unit for leaks, corrosion and damage, and draw oil samples using the correct procedure.

  2. Analyse

    Samples go to a SANAS-accredited laboratory. We interpret the results against IEC 60422 guidance, not just pass/fail limits.

  3. Prioritise

    You get a clear work schedule for every unit, ranked by risk, with the work required and the reason for it.

  4. Fix & record

    Our team does the electrical and mechanical work, labels the unit, and keeps the results on file for re-testing and audits.

Oil analysis · 11 kV / 400 V · 1 800 kVASANAS-accredited lab
Dielectric strength IEC 60156 · limit > 50 kV 53.3kV
Within limit0 — 70 kV
Moisture content ASTM D6304 · limit < 20 mg/kg 21.2mg/kg
Above limit0 — 26 mg/kg

Recommended actionThe oil still insulates well, but it's wet. Dry it with on-site purification, find and fix the moisture source, then re-sample.

Values from a real laboratory report. Client details withheld.
ASTM D3612 · IEC 60599

Dissolved gas analysis

Early warning of arcing, overheating and partial discharge inside the tank.

ASTM D6304

Moisture content

Wet oil weakens insulation and speeds up ageing of the paper.

IEC 60156

Dielectric strength

How well the oil withstands electrical stress before it breaks down.

IEC 62021

Acidity

A sign of oxidation, which forms sludge and attacks paper insulation.

IEC 61619

PCB content

Identifies PCB-contaminated equipment for compliance and safe handling.

IEC 61198

Furanic compounds

Shows how far the paper insulation has aged, and how much life is left.

03 / Why Tecc Oil

Built for sites where downtime isn't an option.

On a mine or a process plant, one failed transformer can stop a shaft, a mill or a line. We work like we understand that, because we do.

One team, both disciplines

Electrical and mechanical skills under one roof. No hand-offs between contractors and one point of accountability.

We bring the plant to you

Our trailer-mounted purification plant treats oil at the transformer, so units don't need to leave site.

Every unit on record

Each transformer is labelled with its sample date, purification date, oil batch, lab report number and technician.

Safe on your site

We work under your permit-to-work, isolation and induction procedures, with the PPE and paperwork mines expect.

04 / Our work

Recent work in the field.

Real photos from real jobs: substations, mini-subs, switchrooms and workshops on mine and industrial sites.

05 / Who we serve

Mining and heavy industry.

Mining

Surface and shaft substations, mini-subs, processing plants and workshops, where transformers run hard in dust, heat and remote locations.

  • Gold
  • Platinum group metals
  • Coal
  • Diamonds
  • Manganese

Industrial

Plants and facilities with their own MV/LV distribution, where unplanned outages mean lost production and missed orders.

  • Manufacturing
  • Processing plants
  • Smelters & refineries
  • Mini-subs & RMUs

06 / About

A focused engineering company, built around one asset.

Tecc Oil is a Randfontein-based engineering company with a single focus: keeping transformers healthy. We work with mines and industrial operations where one transformer failure can stop production.

Our approach is simple. Test properly. Explain the results clearly. Do the electrical and mechanical work right the first time. And keep a record of everything, so the next decision is easier than the last.

We're responsive, fairly priced and easy to deal with, and we use SANAS-accredited laboratories for every sample we submit.

Tecc Oil · Company plateZA
Focus
Transformer maintenance & repair
Disciplines
Oil · Electrical · Mechanical
Sectors
Mining · Industrial
Laboratories
SANAS-accredited
Base
Randfontein, Gauteng
Registered
Blackbird Trading 405 (Pty) Ltd t/a Tecc Oil

07 / FAQ

Questions we're often asked.

Can't find your answer? Call us on 011 568 4666. You'll speak to someone who works on transformers.

How often should transformer oil be tested?

For most distribution and power transformers, at least once a year. Critical units, older units and units with an abnormal previous result should be tested more often. IEC 60422 sets out recommended intervals by equipment category, and we'll recommend a schedule that fits your fleet and your risk.

Can transformer oil be cleaned instead of replaced?

In most cases, yes. On-site purification removes moisture, dissolved gases and particles and restores the oil's dielectric strength, at a fraction of the cost of new oil. If the oil is badly oxidised (high acidity or sludge), replacement may be the better option. The lab results tell us which.

Does the transformer have to be switched off?

Oil sampling and visual inspections can usually be done with the unit in service. Electrical testing, most repairs and purification need the unit isolated. We plan that work with your team around production schedules, and work under your permit-to-work and isolation procedures.

What is a PCB test and why does it matter?

PCBs (polychlorinated biphenyls) are toxic compounds found in some older insulating oils. South African regulations require PCB-containing equipment to be identified, labelled and managed. We test oil for PCB content and label each unit with the result.

Do you work outside Gauteng?

Yes. We're based in Randfontein on the West Rand and work on mine and industrial sites across South Africa. Our purification plant is trailer-mounted, so it travels to wherever your transformers are.

What do I get after a site assessment?

A clear report per unit: nameplate data, condition findings, laboratory results, and a prioritised work schedule showing what needs doing, why, and how urgently. You decide what goes ahead, and when.

Get a clear picture of your transformer fleet.

Tell us how many units you run and where they are. We'll arrange a site visit and give you a prioritised, costed plan.

Book a site assessment

Contact

Talk to an engineer.

Planned maintenance, an abnormal oil result, or a unit that's leaking or running hot? Tell us what's going on and we'll respond promptly.

Request a site assessment

Or ask us anything. We usually reply within one working day.

We only use your details to respond to your enquiry. See our privacy notice.